The Shiradi Ghat section of NH75, linking Bengaluru and Mangaluru, has reopened for 24-hour traffic after extensive debris removal. Frequent landslides caused by heavy rains and unscientific drilling had previously blocked the route. With reduced rainfall and decreased land subsidence, all vehicles can now safely travel. Safety measures, including continuous monitoring, are in place.