The structural detailing of the bridge, which can withstand 260 kmph winds, was done using the sophisticated 'Tekla' software. The bridge construction involved 66,000 CuM Concrete, 26 Km motorable roads, fabrication of 28,660 MT steel and 10 lakh CuM earthwork.