How a Rs 431 Crore Boost Will Transform Bridge No. 57 on Howrah–Kharagpur Line

Published : Dec 25, 2025, 11:07 PM IST
Representative image (File Photo/ANI)

Synopsis

Indian Railways has approved a ₹431.76 crore project to rebuild Bridge No. 57 on the busy Howrah–Kharagpur route, adding a new viaduct, upgraded Kolaghat station facilities and future-ready capacity for higher-speed trains.

Indian Railways has sanctioned a major infrastructure project worth Rs 431.76 crore for rebuilding Bridge No. 57, a vital rail bridge on the Howrah-Kharagpur section under South Eastern Railway (SER). According to an official press release, the project includes rebuilding the bridge substructure on a diverted alignment along with the construction of a new viaduct. It also covers the development of a new Kolaghat Railway Station, comprehensive platform works, and upgraded passenger amenities between Deulti and Kolaghat stations in the Kharagpur Division.

Upgrading a Six-Decade-Old Structure

Bridge No. 57 has been supporting rail operations in this section for over six decades on well-established foundations. The press release mentioned that the sanctioned rebuilding will introduce a modern and robust structure designed to enhance durability and reduce age-related material deterioration. The upgraded design will strengthen safety margins and ensure long-term service reliability.

Engineering for Future Operational Demands

It also aimed at meeting present and future operational requirements. With increasing axle loads, higher traffic volumes, and train speeds of up to 130 kmph, the new bridge will be engineered to efficiently handle a higher gross tonnage of 57 GMT. The modern structure, aligned with current engineering standards, will improve structural resilience and operational performance while matching parallel line infrastructure in the section.

Provision for Future Expansion

Keeping future needs in view, the sanctioned works also include provisions for a 4th railway line. Considering space availability, economy, and technical parameters, a combined substructure capable of accommodating both the Up line and the future 4th line has been planned.

The sanctioned project will significantly enhance safety, connectivity, capacity, and operational efficiency on this busy rail corridor. (ANI)

(Except for the headline, this story has not been edited by Asianet Newsable English staff and is published from a syndicated feed.)

PREV

Stay updated with the Breaking News Today and Latest News from across India and around the world. Get real-time updates, in-depth analysis, and comprehensive coverage of India News, World News, Indian Defence News, Kerala News, and Karnataka News. From politics to current affairs, follow every major story as it unfolds. Get real-time updates from IMD on major cities weather forecasts, including Rain alerts, Cyclone warnings, and temperature trends. Download the Asianet News Official App from the Android Play Store and iPhone App Store for accurate and timely news updates anytime, anywhere.

Read more Articles on

Recommended Stories

Netaji's family urges President Murmu to bring his remains to India
CAQM's Inspection Drive Assesses Road Dust, GRAP Compliance in Delhi