
Bengaluru took a significant step towards modernising its metro network on Thursday as BEML unveiled the first driverless train for the Namma Metro Pink Line, which will connect Kalena Agrahara to Nagawara. The new train is also intended for the upcoming Airport Blue Line, further enhancing the city’s public transport infrastructure.
The prototype train was displayed at the BEML railshed, and its first trial run was conducted in the presence of BEML’s Chairman and Managing Director, Shantanu Roy. Over the next few days, the train will be moved to the BEML Kothanur depot, where extensive trial runs, inspections, and safety checks will be conducted.
In the first phase, six driverless trains will be introduced for the Pink Line, with this prototype being the first. Under the current agreement, BEML will supply a total of 318 standard-gauge metro coaches for both the Blue Line and the Pink Line. All train sets are fully designed, engineered, and manufactured at BEML’s Bengaluru facilities. In addition to production, BEML will also handle comprehensive maintenance of these trains for the next 15 years, ensuring smooth operations.
The six-coach train operates using CBTC (Communication-Based Train Control) technology, allowing fully automated, driverless operation. It has a maximum speed of 90 km/h and can carry up to 2,008 passengers at a time. The train features a completely redesigned, passenger-friendly interior and a stainless-steel car body measuring 2,762 mm in width and 3,800 mm in height. It incorporates regenerative and pneumatic braking systems, making it both energy-efficient and safe.
BEML will supply 20 train sets for the 21.25 km-long Pink Line, which includes 13.76 km of underground sections and 7.5 km of elevated tracks. The Bangalore Metro Rail Corporation (BMRCL) plans to begin commercial service on the elevated section by May 2026, followed by the underground section in December. To ensure smooth operations on the Pink Line in 2026, at least 6-8 trains will be required, and metro officials have stated that BEML is aiming to supply eight trains within the next five months.
BEML has previously supplied trains for Namma Metro’s Purple and Green Lines and has now secured contracts to build a total of 66 trains for the Pink Line, the Blue Line connecting to the international airport, and the Yellow Line. Once the prototype train completes all tests, BMRCL will approach the Railway Department’s Research Designs and Standards Organisation (RDSO) and the Commissioner of Metro Railway Safety for statutory approvals.
Shantanu Roy, CMD of BEML, said, “We have provided state-of-the-art trains that will enhance travel on the Pink and International Airport lines. Through this initiative, BEML is committed to the continued development and modernisation of Bengaluru’s Namma Metro.”
Stay updated with the Breaking News Today and Latest News from across India and around the world. Get real-time updates, in-depth analysis, and comprehensive coverage of India News, World News, Indian Defence News, Kerala News, and Karnataka News. From politics to current affairs, follow every major story as it unfolds. Download the Asianet News Official App from the Android Play Store and iPhone App Store for accurate and timely news updates anytime, anywhere.