Bangalore-Chennai Expressway: Nitin Gadkari gives a major update about Malur section

Published : Jul 23, 2023, 11:19 PM ISTUpdated : Jul 23, 2023, 11:20 PM IST
Bangalore-Chennai Expressway: Nitin Gadkari gives a major update about Malur section

Synopsis

One of the standout features of the Expressway is the implementation of a perpetual flexible pavement design. This design comprises a three-layer, flexible pavement construction concept that results in a resilient asphalt surface with multiple layers, capable of withstanding structural fatigue over an extended period.

The Bangalore-Malur section of the Bangalore-Chennai Expressway in the state of Karnataka, which is being built at an estimated cost of Rs 1160 crore, will have some standout features. Being constructed as part of the ambitious Bharatmala scheme, the Expressway stands out for its innovative perpetual flexible pavement design. This construction concept involves a three-layer, flexible pavement that creates a durable asphalt surface capable of withstanding structural fatigue over an extended period, ensuring enhanced durability, strength, and longevity.

Contingency plan: Army set to induct tribals with similar traits to stem depleting number of Nepalese Gorkhas

The project aims to connect the capital cities of Karnataka and Tamil Nadu, passing through three states: Karnataka, Andhra Pradesh, and Tamil Nadu. The route includes major towns like Hoskote, Malur, Bangarpet, Kolar, Venkatagiri, Palamaneer, Bangarupalem, Chitoor, Ranipettai, and Sriperumbudur.

Union Road Transport and Highways Minister Nitin Gadkari shared this information on Twitter, highlighting the government's commitment to establishing a seamless, hassle-free, and ecologically responsible mobility system across the nation under PM Narendra Modi's leadership.

The National Expressway 7, officially known as the Expressway, is the first of its kind in South India and is being constructed by the National Highways Authority of India under the Bharatmala Pariyojana, with a budget of Rs 16,730 crore. The work is divided into ten packages, with construction initiated at different times in 2021 and 2022.

The Expressway comprises a 262 km stretch between Hoskote (near Bengaluru) and Sriperumbudur (near Chennai), along with a 22.6-km elevated road from Sriperumbudur to Madurvoyal (in Chennai). Designed for a speed of 120 km/h, it aims to significantly reduce travel time between Bengaluru and Chennai from six hours to just 2.15 hours. Moreover, it is approximately 50 km shorter than the existing national highway route that links Bengaluru to Chennai via Hosur and Krishnagiri.

'I&B ministry should probe...' Christopher Nolan's 'Oppenheimer' in row over Bhagavad Gita in sex scene

PREV

Stay updated with the Breaking News Today and Latest News from across India and around the world. Get real-time updates, in-depth analysis, and comprehensive coverage of India News, World News, Indian Defence News, Kerala News, and Karnataka News. From politics to current affairs, follow every major story as it unfolds. Get real-time updates from IMD on major cities weather forecasts, including Rain alerts, Cyclone warnings, and temperature trends. Download the Asianet News Official App from the Android Play Store and iPhone App Store for accurate and timely news updates anytime, anywhere.

Read more Articles on

Recommended Stories

Chennai Weather LATEST Update: Cold Spell Deepens in Hills While Coastal Tamil Nadu Awaits Christmas Showers
Andhra Pradesh, Telangana Weather LATEST Update: IMD Issues Rain Alert Amid Cold Wave; Check Forecast